Anaesthesia Systems for Rodents
Maintenance on laboratory anesthesia machines
Maintenance on laboratory anesthesia machines
Maintenance after sending in / on-site maintenance: On-site maintenance at your premises requires that you can work on a window that can be opened in a room in order to install our suction system (evaporators are opened, this suction is necessary due to escaping anesthetic gases) Existing suction or hood would be sufficient. A work surface / width of approx. 2m² / 2m must be available to enable work with all the necessary testing and measuring tools. An oxygen supply from a bottle or wall connection near the work surface is also required. Please plan the downtime of the devices before using them in your home. Maintenance of the UniVet anesthesia machine is recommended every 2 years. Please contact us to discuss the maintenance of your device. On-site maintenance is possible (from 6 devices per maintenance assignment) or by appointment with other assignments in your area. Please send individual devices to our service workshop in Deggendorf for maintenance. On request, we will send you special packaging for the anesthesia machine in advance to make the process easier for you. After receiving the device, the maintenance will be completed within 2-3 days, so you can expect a downtime of approx. 1 week including transport.
Maintenance on laboratory anesthesia machines
On-site maintenance is possible from 6 devices per maintenance call or by appointment with other calls in your area. On-site maintenance at your premises requires that you can work on a window that can be opened in a room in order to operate our extraction system. An existing suction or hood would also be sufficient. A work surface/width of approx. 2m²/2m must be available to enable work with all the necessary testing and measuring tools. A supply of oxygen from a bottle or wall outlet near the work surface is also required. Please plan the downtime of the devices before using them in your house. Servicing of the table anesthetic machines is recommended every 2 years. Please contact us to discuss the date and organization of the maintenance in your house.
Qualified maintenance on all series of anesthesia vaporizers and table anesthesia machines
Collection service for tabletop anesthesia machines
Wir bieten ihnen zur vereinfachten Abwicklung der Wartung auch einen Abholservice an und_cc781905-5cde -3194-bb3b-136bad5cf58d_ _cc781905-5cde-3194-bb3b- 136bad5cf58d_ senden ihnen auf Wunsch vorab a packing case for your anesthetic machine.
-
Pack the device without hoses and accessories securely for shipping.(Please use sufficient package size and foam. On request, we will send you packaging material in advance).
-
Tell us by email the desired pick-up address and the earliest pick-up date.(Address that is known and/or easily accessible for deliverers, e.g. gate, goods receipt, office)
-
Print out the dispatch note we sent and stick it on the package.
-
Place the package at the pickup location you specified.
-
The package will be delivered within 2 days from the named collection date between9 a.m. and 5 p.mpicked up by UPS.
-
You will receive the processed device back within 3-5 working days.
-
The costs for collection per package up to 15 kg: 23.00 € plus VAT.
Please only book if you can be present on the possible pick-up days between 9 a.m. and 5 p.m.